Steps in Construction of a Concrete Swimming Pool and Waterproofing Measures
1. Planning and Design
- Activities: Conduct site survey and soil analysis. Prepare a design that includes dimensions, depths, and drainage.
- Waterproofing Measure: Plan waterproofing systems and materials during the design phase to integrate seamlessly.
2. Excavation
- Activities: Mark the pool area and excavate to the required dimensions.
- Waterproofing Measure: Ensure proper slope and drainage to avoid water accumulation in the excavation pit.
3. Formwork and Reinforcement
- Activities: Install formwork and reinforcement bars as per the design.
- Waterproofing Measure: Use corrosion-resistant reinforcement bars to prevent deterioration.
4. Concrete Placement
- Activities: Pour and cure the concrete to form the pool shell.
- Waterproofing Measure: Add waterproofing admixtures to the concrete mix to reduce permeability.
5. Surface Smoothing
- Activities: Smooth the concrete surface to prepare it for waterproofing.
- Waterproofing Measure: Fill voids or cracks with epoxy or polymer-based fillers.
6. Application of Base Waterproofing Layer
- Activities: Apply a cementitious waterproofing slurry or liquid membrane over the pool shell.
- Waterproofing Measure: Ensure a uniform coating, focusing on corners and joints.
7. Tiling and Grouting
- Activities: Lay tiles using waterproof tile adhesive. Apply epoxy-based grout for the joints.
- Waterproofing Measure: Ensure grout is non-porous to prevent water seepage.
8. Plumbing and Fittings
- Activities: Install pool plumbing, skimmers, and other fittings.
- Waterproofing Measure: Seal all pipe penetrations with flexible waterproof sealants.
9. Final Waterproofing Layer
- Activities: Apply a secondary waterproofing membrane over the tiled surface (optional).
- Waterproofing Measure: Use a clear liquid waterproofing solution to seal the surface further.
10. Testing and Finishing
- Activities: Fill the pool with water to test for leaks. Perform finishing touches such as coping and decking.
- Waterproofing Measure: Repair any leaks identified during testing with a waterproofing patch or injection grout.
11. Pool Maintenance
- Activities: Regularly check for cracks or grout wear.
- Waterproofing Measure: Reapply waterproofing coatings as needed over time.
By incorporating waterproofing at every stage, you ensure the longevity and structural integrity of the swimming pool.
In BPT we have special division to take care of swimmingpool waterproofing and providing best possible solutions from the day one..
To know more on BPChem, do get in touch with us on balaji@bptonline.in or whatsapp number 9980789618. Our team from BPchem , waterproofing and repairs shall love to help you
Dr Balaji Roshan Singh
Founder and CEO of BPT group
Few links to click and understand our individual brands
BPTOnline-Corporate:-
BPChem:-
BPArch:-
BPPaints:-
BPSOL,