Steps Involved by BPChem in Waterproofing Consultancy & PMC for Commercial Buildings

BPChem’s expertise ensures commercial buildings remain structurally sound and protected from water damage.

Steps Involved by BPChem  in Waterproofing Consultancy & PMC for Commercial Buildings

Phase 1: Consultancy for Waterproofing Works

1. Initial Assessment & Site Survey

 

  • Conducting a detailed site inspection to identify potential water ingress points.
  • Evaluating existing waterproofing systems, if any.
  • Using moisture meters, infrared scanning, or core sampling for accurate diagnosis.

 

2. Problem Identification & Risk Analysis

 

  • Identifying leakage sources, structural cracks, and weak areas.
  • Analyzing environmental factors like rainfall, water table levels, and thermal effects.
  • Assessing the impact of poor drainage or faulty construction practices.

 

3. Selection of Suitable Waterproofing Systems

 

  • Recommending the best waterproofing materials and techniques based on site conditions.
  • Suggesting solutions like liquid membranes, crystalline coatings, bituminous sheets, or polyurethane-based systems.
  • Ensuring material compatibility with structural elements.

 

4. Cost Estimation & Technical Specifications

 

  • Preparing a detailed Bill of Quantities (BOQ) with cost estimates.
  • Providing detailed technical specifications and material procurement guidelines.
  • Advising on budget optimization without compromising quality.

 

5. Proposal & Client Approval

 

  • Presenting the waterproofing strategy and expected outcomes to the client.
  • Revising recommendations based on client preferences and budget constraints.
  • Obtaining necessary approvals before project execution.

 

 

Phase 2: Project Management Consultancy (PMC) for Waterproofing Works

6. Vendor Selection & Contracting

 

  • Assisting in selecting experienced waterproofing contractors.
  • Verifying vendor credentials, past work, and compliance with industry standards.
  • Drafting contracts with clear scope, timelines, and quality benchmarks.

 

7. Execution Planning & Work Supervision

 

  • Developing a phased execution plan with milestones.
  • Supervising material procurement, storage, and application techniques.
  • Ensuring adherence to approved specifications and timelines.

 

8. Quality Control & Testing

 

  • Conducting on-site inspections to monitor workmanship and material usage.
  • Performing water ponding tests, adhesion tests, and core sampling to verify waterproofing integrity.
  • Ensuring compliance with national and international waterproofing standards.

 

9. Handover & Documentation

 

  • Preparing a final waterproofing report with as-built drawings and warranty details.
  • Conducting a final site walkthrough with the client for approval.
  • Handing over maintenance guidelines and future preventive measures.

 

10. Post-Execution Monitoring & Maintenance

 

  • Scheduling periodic inspections to check for defects or early signs of failure.
  • Training facility managers on proper upkeep and minor repairs.
  • Providing AMC (Annual Maintenance Contract) services, if required.

 

BPT is a group of Green warriors who get all green sustainable products to your doorstep.

Dr Balaji Singh

Founder & CEO of BPT group

 

 

Visit following links to know more about BPT

Few links to click and understand our individual brands

BPTOnline-Corporate:-

https://bptonline.in/

https://www.facebook.com/BuildingProtectiveTechnologies

https://www.instagram.com/bpt.online/

https://www.linkedin.com/company/82581083/admin/?lipi=urn%3Ali%3Apage%3Ad_flagship3_feed%3BREWmU7rrQBaR6%2B0gq8e1tg%3D%3D

 

BPChem:-

https://bpchem.net/

https://www.instagram.com/bp_chemicals/

https://www.facebook.com/profile.php?id=61560282492657

https://www.linkedin.com/company/82581083/admin/?lipi=urn%3Ali%3Apage%3Ad_flagship3_feed%3BREWmU7rrQBaR6%2B0gq8e1tg%3D%3D

Paints
Protective Paints